Nordex Group Receives Order for 99 MW Project from Argentina
Stay informed with our
free newsletters

This news is classified in: Sustainable Energy Wind

Sep 4, 2018

Nordex Group Receives Order for 99 MW Project from Argentina

Hamburg, Buenos Aires, 4 September 2018 - The Nordex Group has received an order from AES Argentina Generación, a subsidiary of the energy provider AES Corporation, for the delivery of 30 AW132/3300 turbines.

The “Energética” wind farm is located in the Province of Buenos Aires near Bahia Blanca. The location is characterised by average wind speeds above 10 metres per second. The Nordex Group will be assembling the turbines locally in Argentina and will be manufacturing the 120-metre high concrete towers locally as well. The contract also comprises a multi-year service for the wind farm.

Green Hydrogen Market - Global Forecast 2024-2030

Green Hydrogen Market - Global Forecast 2024-2030

by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application

Download free sample pages

Nordex