Vestas Secures 228 MW Order from Pacificorp
Stay informed with our
free newsletters

This news is classified in: Sustainable Energy Wind

May 16, 2019

Vestas Secures 228 MW Order from Pacificorp

Vestas has received an order for 228 MW of V136-4.2 MW, operating in 4.3 MW power optimised mode, from PacifiCorp, a subsidiary of Berkshire Hathaway Energy, for the 250 MW Ekola Flats wind project, located in Wyoming.  

Ekola Flats is part of PacifiCorp’s Energy Vision 2020 initiative, a USD 3.1 billion investment to expand wind power via repowering existing projects, adding 1,150 MW of new wind resources by the end of 2020, and building a 140-mile transmission line segment in Wyoming to enable wind generation.

As part of Energy Vision 2020, Vestas and PacifiCorp earlier last week announced 459 MW of V136-4.2 MW, operating in 4.3 MW power optimised mode, for the TB Flats I and II projects, and previously partnered on repowering the Marengo and Marengo II wind projects in Washington, upgrading the site’s existing V80-1.8 MW turbines with V100-2.0 MW turbines.

Green Hydrogen Market - Global Forecast 2024-2030

Green Hydrogen Market - Global Forecast 2024-2030

by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application

Download free sample pages

“We’re pleased PacifiCorp has again selected our 4 MW platform for the Ekola Flats projects”, said Chris Brown, President of Vestas’ sales and service division in the United States and Canada. “The V136-4.2 MW, operating in 4.3 MW power optimised mode is well suited to capture the maximum available wind resource at Ekola Flats, and ensure low-cost, reliable wind energy benefits PacifiCorp’s customers and communities”.

The order includes supply and commissioning of the turbines as well as a 12-year Active Output Management 4000 (AOM 4000) service agreement, designed to ensure optimised performance of the project. Turbine delivery is expected to begin in the second quarter of 2020, with commissioning scheduled for the third quarter of 2020.


Vestas