Hamburg, 01 July 2019. End of June the Nordex Group has received a further order for 38 turbines from the N149/4.0-4.5 Delta4000 series, which will be the second of its kind installed at a U.S. wind energy project. The wind turbines, which will be installed at a Texas wind farm that has a proposed energy generating capacity of approximately 180-megawatts will be delivered in the summer of 2020.
The order includes supply and delivery of the wind turbines with an operation range of 4.8 MW. A Premium Service Agreement with a term of 5 years will also be included.
by Type (Scheduled Maintenance, Unscheduled Maintenance), Location type (Onshore, Offshore), Turbine Connectivity (Grid-connected, Standalone), and Region
Download free sample pages