The Nordex Group to Deliver 38 Delta4000 Turbines to the USA
Stay informed with our
free newsletters

This news is classified in: Sustainable Energy Wind

Jul 1, 2019

The Nordex Group to Deliver 38 Delta4000 Turbines to the USA

Hamburg, 01 July 2019. End of June the Nordex Group has received a further order for 38 turbines from the N149/4.0-4.5 Delta4000 series, which will be the second of its kind installed at a U.S. wind energy project. The wind turbines, which will be installed at a Texas wind farm that has a proposed energy generating capacity of approximately 180-megawatts will be delivered in the summer of 2020.

The order includes supply and delivery of the wind turbines with an operation range of 4.8 MW. A Premium Service Agreement with a term of 5 years will also be included.

Green Hydrogen Market - Global Forecast 2024-2030

Green Hydrogen Market - Global Forecast 2024-2030

by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application

Download free sample pages

Nordex