TechnipFMC Awarded a Significant Integrated EPCI (iEPCI) Con
Stay informed with our
free newsletters

TechnipFMC Awarded a Significant Integrated EPCI (iEPCI) Contract for the Shell PowerNap project in the Gulf of Mexico

TechnipFMC has been awarded a significant(1) integrated Engineering, Procurement, Construction and Installation (iEPCI™) contract by Shell for the PowerNap project, located in the Gulf of Mexico.

TechnipFMC will design, manufacture and install subsea hardware, including subsea tree systems, subsea distribution controls, topside controls, flying leads and connectors for three wells, in addition to the supply of 20 miles of production umbilical and flowlines.

Arnaud Pieton, President Subsea at TechnipFMC, commented: “We are very pleased to have been awarded this iEPCITM contract for the Shell PowerNap project. We look forward to executing the scope of work and to further expanding our 25-year successful relationship with Shell and our deep water portfolio in the Gulf of Mexico.”

Tight Gas Market Report: Trends, Forecast and Competitive Analysis to 2031

Tight Gas Market Report: Trends, Forecast and Competitive Analysis to 2031

Key data points: The growth forecast = 5.0% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities and forecasts in tight gas market to 2031 by type (processed tight gas and unprocessed tight gas), application (residential, commercial, industrial production, power generation, and others), and region (North America, Europe, Asia Pacific, and the Rest of the World)

Download free sample pages

PowerNap is a subsea tie-back project to the Olympus production hub and is located in Mississippi Canyon, Block MC943 in the Gulf of Mexico. The project is expected to complete installation in late 2021 and produce up to 35,000 barrels per day of oil equivalent at peak rates.

1. For TechnipFMC, a “significant” contract is between $75 million and $250 million

 


Publishdate:
Aug 22, 2019
TechnipFMC